Need Formwork? How Our Process Works

11 March 2019 - by Neeform
Grey Background

Formwork is an essential sector of construction which refers to a temporary mould into which concrete is poured so that it can be set to the required shape. It is extremely vital in supporting a construction project or structure. Our formwork contractors go through intricate processes to complete efficient construction solutions.

If you need formwork done for your project, read our guide on how the process works.

Step 1: Consultation and Design

The process of securing a new project typically begins with an initial contact, often in the form of a phone call, between the prospective client and the service provider. In this case, the representative of the company uses this initial contact as an opportunity to gauge the details and requirements of the potential project.

This allows us to assess the scope of work, the client’s needs, and any specific considerations that will need to be factored into the proposal.

Once the initial discussions have taken place, the client will typically provide a set of drawings and a bill of quantities – a detailed breakdown of the measurements and specifications outlined in the drawings. This documentation serves as the foundation to develop a comprehensive quote for the project.

With these materials in hand, we can carefully analyse the scope of work, calculate material and labour costs, and determine the most competitive and realistic pricing to present to the client. The thoroughness of this quoting process is crucial, as it ensures that our proposal accurately reflects the true demands of the project.

Step 2: Site Survey

In some cases, a site survey is conducted before finalising the quote. This on-site assessment allows our surveyor to gather additional insights and details that may not be fully captured in the initial drawings and documentation.

By physically inspecting the project location, the surveyor can identify any potential challenges or unique considerations that could impact the project timeline, resource requirements, or overall cost. Then a quote will be provided with the most accurate and comprehensive proposal possible.

concrete background

Step 3: Establishing Lead Times

The lead times for Nee Formwork can vary quite significantly depending on the size and scale of the project at hand. For smaller, more straightforward projects, the lead time can be remarkably quick – sometimes as little as the very next day.

However, as the projects start to grow in size and complexity, the lead times naturally increase. For slightly bigger jobs, a lead time of around a month is more common, as we need to coordinate materials, labour, and logistics to ensure everything comes together seamlessly.

For substantial projects – the big, complex jobs that require large-scale, intricate formwork systems – lead times can stretch out to within a year. These larger endeavours demand extensive planning, engineering, and preparation to get right, so we have to build in ample time to deliver a final product that meets all the necessary specifications and requirements.

Ultimately, the lead time for Nee Formwork comes down to the sheer scale of the project – the bigger and more complex the job, the longer it will take to complete. But no matter the size, Nee is committed to providing top-quality formwork solutions in a timely, efficient manner.

Step 4: Engineering and Fabrication

The engineering processes involved in creating high-quality formwork systems are quite advanced, requiring meticulous precision and technical expertise.

Integrated bracing, adjustable supports, and other engineered features further reinforce the formwork’s structural integrity, allowing it to maintain perfect alignment even as the concrete cures. This level of advanced fabrication is critical, as any irregularities or weaknesses in the formwork could compromise the strength, appearance, and overall quality of the final concrete structure.

Step 5: Delivery and Installation

Depending on the type of formwork required, each project has different specifications. Each project abides by its installation process and delivery. The team will be in touch throughout the entire process. Whatever the project requires, the expertise and professionalism of the team ensure a timely project execution.

Step 6: Inspection and Safety

Ensuring the integrity and safety of formwork is a critical aspect of construction projects, and a well-defined inspection protocol is essential to achieve this.

The inspection process typically begins with a thorough examination of the formwork materials, ensuring they are of the appropriate grade, free from defects and capable of withstanding the anticipated loads.

Additionally, our inspection may involve testing the formwork’s load-bearing capacity and subjecting it to simulated loads to ensure it can safely support the weight of the concrete and any additional construction materials.

By prioritising safety, we can confidently safeguard the integrity of the formwork and ensure the overall safety and structural integrity of the project, as well as our staff.

Formwork is a technical and intricate process, furthermore, Nee Formwork ensures they do everything they can to make it a smooth journey for any given project. Our team have the expertise and knowledge to provide quality formwork solutions and will prioritise safety above anything.

If you need efficient and reliable formwork contractors for your project, just contact Nee Formwork today to get started.